August 2004 Progress Pictures

Unloading the steel structure of the 1st phase

Erecting the steel frame structure of the 1st phase

Partial erected steel structure of the 1st phase

Full erected steel structure of 1st phase


Water main hook up

Forming the block walls for the shop office

Pouring the cement for the spray booth foundation

Installing the roof panels and insulation

Laying out heating tubes for the heated floor

Crane for pumping the concrete

Pumping the concrete for the floor

The finished concrete floor

Steel studding for interior walls